Mt Isa Mines, QLD
Client: Metso Minerals
Year: 2009-2010
Field support and failure analysis for hydrostatic trunnion bearing on ball mill
Mineral Hill Project, NSW
Client: Kimberley Metals
Year: 2010
Inspection and condition report on existing ball mills to enable mills to be returned to service after being on care and maintenance
Batu Hijau, Indonesia
Client: Metso Minerals
Year: 2009
Training on Mill Trunnion bearing lubrication systems
Telfer Gold Project, WA
Client: Newcrest Mining Limited
Year: 2009
Grinding mill lubrication systems reliability audit and review
Savage River Shell Replacement
Client: Metso Minerals
Year: 2010
Support for manufacturing of replacement mill shell
Boddington Gold Mine, WA
Client: Metso Minerals
Year: 2009-2010
Technical support on grinding mills
Kayelekera Project Mill Refurbishment
Client: Paladin Resources (Africa)
Year: 2006-2009
Inspection and condition reporting of used mill
Oversight of loading for shipment to Africa from Philippines Preparation of refurbishment work scope
Mill Replacement Study
Client: Alcoa World Alumina Australia
Year: 2008-2009
Inspection and study of options for repair or replacement of mill
Engineering support for 2008 Lifecycle Cost Modelling
Client: Rio Tinto Coal Australia Pty Ltd
Year: 2008
Mindoro Nickel Project DFS Support
Client: Philipp's Technical Consultants Corporation
Year: 2008-2009
Mill Speed Upgrade Review
Client: Ok Tedi Mining Limited
Year: 2008-2009
Root Cause Analysis - Crusher Failure
Client: Northparkes Mines (North Mining Limited)
Year: 2007-2008
Project Coordination
Client: Oceanagold (Philippines), Inc.
Year: 2007
Didipio Gold Copper Project
Client: Cullen Mining Services Pty Ltd
Year: 2006
Project Engineering services
Black Swan Project Mill Refurbishment
Client: Metso Minerals
Year: 2006
Inspection and reporting of condition of used SAG mill. Services included the preparation of refurbishment plans and supervision of refurbishment activities for the mill.
Capital Cost Estimate for Molymines Molybdenum Project
Client: Battery Limits Pty Ltd
Year: 2006
Preparation of capital cost estimate for section of plant.
Ball Mill Gearbox Failure Analysis
Client: Metso Minerals
Year: 2005
Inspection, failure analysis and reporting of ball mill gearbox bearing failures.
Austindo Project - Inspection of Used Mill
Client: Cullen Mining Services Pty Ltd
Year: 2005
Inspection and condition report preparation for a used ball mill being purchased by Austindo for project in Indonesia.
In-situ Machining of SAG Mill Trunnion Flange
Client: Metso Minerals
Year: 2005
Provision of technical support services to resolve installation problems of a SAG mill that required in-situ machining of trunnion mounting flange to eliminate excessive run-out.
Prominent Hill Pre-feasibility Quantity Take-off
Client: Cullen Mining Services
Year: 2005
Preparation of preliminary arrangements and engineering to enable to preparation of quantities for the development of a capital cost estimate.
Lumwana Project Technical Support for Mill Tender Evaluation
Client: GRD Minproc
Year: 2005
Technical Support for Mill Tender Evaluation
Mupane Gold Project Construction Review
Client: Cullen Mining Services Pty Ltd
Year: 2004
Provision of services to undertake a Construction review
Rapu Rapu Polymetallic Project
Client: Cullen Mining Services
Year: 2004
Provision of engineering support services for the purchase and refurbishment of a ball and SAG mill.
Pre-feasibility Capital Cost Estimate for Fosterville Sulphide Project
Client: Cullen Mining Services
Year: 2004
Telfer Ball Mill Fabrication Supervision
Client: Metso Minerals
Year: 2003
Provision of workshop supervision for the resolution of fabrication problems during the fabrication of the ball mill shells. Activities included workshop scheduling, purchaser liaison and inspection.
Georgia Minerals Sand Project
Client: Cullen Mining Services Pty Ltd
Year: 2002
Project Engineering services
Regrind Mill Refurbishment Project
Client: Northparkes Mines
Year: 2000
Provision of project management, inspection and technical services for the refurbishment and installation oversight of a used ball mill
Ball Mill Gear Failure Analysis
Client: Northparkes Mines
Year: 2000
Analysis of SAG mill motor failure
SAG Mill Motor Failure Analysis
Client: Northparkes Mines
Year: 2000
Analysis of SAG mill motor failure
Lithgow Silicon Smelter
Client: Australian Silicon
Year: 2000
Provision of project engineering services including the review of project specifications and capital costs.
Torsional Analysis of Compressor System
Client: Industry Uniserve
Year: 1996
Design of Feed Hopper Extension for Thermal Soil Remediation Unit
Client: ADI Industrial Decontamination Division
Year: 1993