Engineering and Project Management

item3a
item5
item6
item7
item8
item9
item10
item11
item13
item14
homeOver1
FreeCounter

Mt Isa Mines, QLD

Client: Metso Minerals

Year: 2009-2010

Field support and failure analysis for hydrostatic trunnion bearing on ball mill

Mineral Hill Project, NSW

Client: Kimberley Metals

Year: 2010

Inspection and condition report on existing ball mills to enable mills to be returned to service after being on care and maintenance

Batu Hijau, Indonesia

Client: Metso Minerals

Year: 2009

Training on Mill Trunnion bearing lubrication systems

Telfer Gold Project, WA

Client: Newcrest Mining Limited

Year: 2009

Grinding mill lubrication systems reliability audit and review

Savage River Shell Replacement

Client: Metso Minerals

Year: 2010

Support for manufacturing of replacement mill shell

Boddington Gold Mine, WA

Client: Metso Minerals

Year: 2009-2010

Technical support on grinding mills

Kayelekera Project Mill Refurbishment

Client: Paladin Resources (Africa)

Year: 2006-2009

Inspection and condition reporting of used mill

Oversight of loading for shipment to Africa from Philippines Preparation of refurbishment work scope

Mill Replacement Study

Client: Alcoa World Alumina Australia

Year: 2008-2009

Inspection and study of options for repair or replacement of mill

Engineering support for 2008 Lifecycle Cost Modelling

Client: Rio Tinto Coal Australia Pty Ltd

Year: 2008

Mindoro Nickel Project DFS Support

Client: Philipp's Technical Consultants Corporation

Year: 2008-2009

Mill Speed Upgrade Review

Client: Ok Tedi Mining Limited

Year: 2008-2009

Root Cause Analysis - Crusher Failure

Client: Northparkes Mines (North Mining Limited)

Year: 2007-2008

Project Coordination

Client: Oceanagold (Philippines), Inc.

Year: 2007

Didipio Gold Copper Project

Client: Cullen Mining Services Pty Ltd

Year: 2006

Project Engineering services

Black Swan Project Mill Refurbishment

Client: Metso Minerals

Year: 2006

Inspection and reporting of condition of used SAG mill. Services included the preparation of refurbishment plans and supervision of refurbishment activities for the mill.

Capital Cost Estimate for Molymines Molybdenum Project

Client: Battery Limits Pty Ltd

Year: 2006

Preparation of capital cost estimate for section of plant.

Ball Mill Gearbox Failure Analysis

Client: Metso Minerals

Year: 2005

Inspection, failure analysis and reporting of ball mill gearbox bearing failures.

Austindo Project - Inspection of Used Mill

Client: Cullen Mining Services Pty Ltd

Year: 2005

Inspection and condition report preparation for a used ball mill being purchased by Austindo for project in Indonesia.

In-situ Machining of SAG Mill Trunnion Flange

Client: Metso Minerals

Year: 2005

Provision of technical support services to resolve installation problems of a SAG mill that required in-situ machining of trunnion mounting flange to eliminate excessive run-out.

Prominent Hill Pre-feasibility Quantity Take-off

Client: Cullen Mining Services

Year: 2005

Preparation of preliminary arrangements and engineering to enable to preparation of quantities for the development of a capital cost estimate.

Lumwana Project Technical Support for Mill Tender Evaluation

Client: GRD Minproc

Year: 2005

Technical Support for Mill Tender Evaluation

Mupane Gold Project Construction Review

Client: Cullen Mining Services Pty Ltd

Year: 2004

Provision of services to undertake a Construction review

Rapu Rapu Polymetallic Project

Client: Cullen Mining Services

Year: 2004

Provision of engineering support services for the purchase and refurbishment of a ball and SAG mill.

Pre-feasibility Capital Cost Estimate for Fosterville Sulphide Project

Client: Cullen Mining Services

Year: 2004

Telfer Ball Mill Fabrication Supervision

Client: Metso Minerals

Year: 2003

Provision of workshop supervision for the resolution of fabrication problems during the fabrication of the ball mill shells. Activities included workshop scheduling, purchaser liaison and inspection.

Georgia Minerals Sand Project

Client: Cullen Mining Services Pty Ltd

Year: 2002

Project Engineering services

Regrind Mill Refurbishment Project

Client: Northparkes Mines

Year: 2000

Provision of project management, inspection and technical services for the refurbishment and installation oversight of a used ball mill

Ball Mill Gear Failure Analysis

Client: Northparkes Mines

Year: 2000

Analysis of SAG mill motor failure

SAG Mill Motor Failure Analysis

Client: Northparkes Mines

Year: 2000

Analysis of SAG mill motor failure

Lithgow Silicon Smelter

Client: Australian Silicon

Year: 2000

Provision of project engineering services including the review of project specifications and capital costs.

Torsional Analysis of Compressor System

Client: Industry Uniserve

Year: 1996

Design of Feed Hopper Extension for Thermal Soil Remediation Unit

Client: ADI Industrial Decontamination Division

Year: 1993